Hwa Chong Institution  
line decor
  
line decor

 
 
 

 
Announcement

See you next year for the 27th Projects Competition 2011.
Posted: 17 Sep 2010

Click HERE to view the winners of the Projects Day Grand Finals 2010.
Posted: 16 Sep 2010

Five groups have been selected to move on to the Projects Day Grand Finals which will be held on 16 Sep (Thu) from 2.00 pm. More information regarding the rehearsals and details will be disseminated on the EMB by the OS-PDGF in due time. Click HERE to see the 5 Grand Finalists.
Posted: 6 Sep 2010

This is to inform that the Patrons for the Projects Day Grand Finals, to be held on 16 Sep (Thu), are Mr William Yiu and Mr Lim Puay Koon.
Posted: 1 Sep 2010

The Grand Finals Selection Round will be held on 2 Sep (Thu) from 2.00 pm onwards. Information has been disseminated on the EMB. Click HERE to see the nominees.
Posted: 26 Aug 2010  COMPLETED

Results for the Project Finals round have been released. Please refer to the EMB for more information.
Posted: 18 Aug 2010  COMPLETED

After web-reports have been uploaded, please check for quality control. Some bits of advice are available HERE.
Posted: 31 Jul 2010  COMPLETED

Instructions for the Oral Presentation on 13 Aug (Fri) for Project Finalists have been disseminated on the EMB. The same information is available HERE.
Posted: 25 Jul 2010  COMPLETED

Instructions for Project Finalists to upload their web-reports have been disseminated on the EMB. The same information is available HERE.
Posted: 21 Jul 2010  COMPLETED

For groups that qualify for the Finals, please be informed that the next judging round will be on 13 Aug (Fri) afternoon. More information will be disseminated soon.
Posted: 14 Jul 2010  COMPLETED

Projects Semi-finals results have been released. Please refer to the EMB for details.
Posted: 13 Jul 2010  COMPLETED

Details for Semi-finals judging on 7 Jul (Wed) have been released on the EMB.
Posted: 2 Jul 2010   COMPLETED

Please be informed that Semi-finals judging is scheduled on 7 Jul (Wed) during curriculum time. More details will be released soon.
Posted: 27 Jun 2010  COMPLETED

All groups are to upload their project synopsis onto the project server by 2 Jul (Fri), 5.00 pm. Details have been made available on the EMB dated 23 Jun (Wed).
Posted: 25 Jun 2010  COMPLETED

Results for Prelim1 (held on 7 Apr, Wed) were posted on the EMB. Groups that have cleared Prelim1 and groups going for Prelim2, more information HERE.
Posted: 12 Apr 2010  COMPLETED

Preliminary Round judging will be carried out on 7 April (Wed) during curriculum time. Information has been made available on the EMB. Click HERE to view the venues.
Posted: 14 Mar 2010   1 Apr 2010  COMPLETED

The materials used for the Projects briefing-cum-workshop conducted on 9 Mar (Tue) from 10.00 am to 11.30 am are available. Click HERE to view it.
Posted: 12 Mar 2010  COMPLETED

Projects Competition registration has closed on 9 Mar (Tue). The next phase is to get ready for the Preliminary Round judging.
Posted: 10 Mar 2010  COMPLETED

Projects Competition briefing-cum-workshop by the respective Category Managers will be carried out on 9 Mar (Tue) from 2.00 pm to 4.00 pm after the Sabbaticals activities. Details are available on the EMB. Click HERE to view the locations used for the briefing.
Posted: 4 Mar 2010  COMPLETED

Gentle reminder - The closing date for Projects Competition registration for Sec 2, 3, 4 is  5 Mar (Fri) 5.00 pm, for Sec 1 is 9 Mar (Tue) 5.00 pm.
Posted: 3 Mar 2010  COMPLETED

Projects Competition registration is now opened from 1 Feb (Mon). More information is available on the EMB.
Posted: 1 Feb 2010  COMPLETED

 

Click on the image to view the briefing slides presented during the level assemblies.
Posted: 28 Jan 2010  COMPLETED

To be eligible to take part in the Projects Competition, pupils must first accept the Terms and Conditions as laid out in the Ethics Agreement. It is now open from 18 Jan (Mon) till 29 Jan (Fri, 3.00 pm). Look under Registration for the link.
Posted: 9 Jan 2010, 18 Jan 2010  COMPLETED

Projects Competition briefing will be carried out during the respective level assemblies as follows:
Sec 1 = 18 Jan (Mon)
Sec 2 = 19 Jan (Tue)
Sec 3 = 20 Jan (Wed)
Sec 4 = 21 Jan (Thu)
Posted: 8 Jan 2010, 17 Jan 2010  COMPLETED

 


 
 

 

 

 


 
 
 
  Copyright 2010   Hwa Chong Institution   All Rights Reserved   661 Bukit Timah Road Singapore 269734     Contact Webmaster